Detalle del backtest

EA: ea-tokyofix-eurjpy-m5 / 0.3.0 / 0.3.0|20260911T071145Z
Operaciones
401
Factor de beneficio
1.36
DD máx. %
0.27
Ganancia neta
42.4
Operaciones al año
45
Periodo analizado (UTC)
2010-01-01 2018-12-31
Duración: 9.00 años
Símbolo / Temporalidad
EURJPY / PERIOD_M5
Modelado: EveryTick · ticks reales en el 0% del periodo
evidence fuera de muestra ajustado sobre 2019-01-01 → 2026-09-05
Datos de la ejecución
Barras: 666,927 Ticks: 291,949,283
Nota del tester
pv 0.3.0 = pv 0.1.0 + Japanese holiday calendar (engine build 0.2.0, InpSkipJpHolidays=true): no banks, no fix, so JP holidays are skipped and a gotobi flow that lands on one rolls back to the previous business day, the same way weekends already did. OUT-OF-SAMPLE 2010-2018; pv 0.1.0 on the same window: 400 / 1.32 / +$39 (trades / PF / net). About 30 holiday-day trades are replaced by ~30 rolled-back ones; the money is a wash (the holiday days had been carrying a few lucky outliers), the rule is now correct by construction. Headless run; generated ticks before 2026.
Todos los campos
Valores tal cual se registraron del informe de MT5 y de la carga de datos.
RowKey 0.3.0|20260911T071145Z
Versión del EA 0.3.0
Símbolo EURJPY
Temporalidad PERIOD_M5
Inicio del test (UTC) 2010-01-01
Fin del test (UTC) 2018-12-31
Operaciones totales 401
Factor de beneficio 1.36
Ganancia neta 42.4
DD máx. sobre balance % 0.27
DD máx. sobre capital % 0.62
Barras 666,927
Ticks 291,949,283
Calidad del modelado % 0.00
Nota del tester pv 0.3.0 = pv 0.1.0 + Japanese holiday calendar (engine build 0.2.0, InpSkipJpHolidays=true): no banks, no fix, so JP holidays are skipped and a gotobi flow that lands on one rolls back to the previous business day, the same way weekends already did. OUT-OF-SAMPLE 2010-2018; pv 0.1.0 on the same window: 400 / 1.32 / +$39 (trades / PF / net). About 30 holiday-day trades are replaced by ~30 rolled-back ones; the money is a wash (the holiday days had been carrying a few lucky outliers), the rule is now correct by construction. Headless run; generated ticks before 2026.
Si la ejecución tiene pocas operaciones, el PF es poco fiable: compara varias ejecuciones antes de sacar conclusiones.